Digital Crayon: Article 11 – Aligning Existing School Facilities with 21st Century Learning

By

posted by David Epstein, AIA, LEED AP In the last article, we discussed how greening an existing school is often more difficult than building a new school. The same could be said for integrating 21st century learning concepts into an existing facility.  Despite the challenges, I would say this is a goal of every school […]

Digital Crayon: Article 10 – Greening Your Existing School Facility

By

posted by David Epstein, AIA, LEED AP In our last article, we discussed the sustainability in a general way as viewed through the lens of the LEED Green Building Rating System. I am sure many of you are wondering: how do I green my existing facility. Here again, looking at LEED’s Existing Building: Operations + Maintenance […]

Digital Crayon: Article 7 – Technology in Schools

By

posted by David Epstein, AIA, LEED AP In our last conversation, we looked at the Learning Commons (aka Library) and started discussing technology. This is a subject worth spending a little more time on. While schools we work with are all increasingly integrating technology into the learning experience, they are all at different parts of […]

Digital Crayon: Article 5 – 21st Century Learning

By

Another key driver behind school change is the need to align facilities with the way schools now teach  (or at least want to). The full spectrum of changes in education these days is generally termed “21st Century Learning”. This term refers to ideas like student-centered learning, project-based inquiry, interdisciplinary themes, etc.  The goal is to […]

Digital Crayon: Article 4 – School Traffic and Safety

By

Our last article was about growth and community. Another big issue with virtually all schools we work with is on-site traffic congestion and safety. Everybody is driving their kids to schools these days. This results in backups and delays, both on and off the school grounds.  Because of this, people park everywhere and kids cross […]

Digital Crayon: Article 2 – The School Planning Process

By

Last article we discussed getting started on a facility project. In this article, let’s discuss how the master planning process might work. If it is an existing building or campus, we generally divide up the process into three components: Facility Analysis, Programming and Concept Design. If it’s a totally new project, then of course the […]